Building Forms, Permits, and Inspections

Building permits are required for all new construction, remodeling, and repairs. This includes interior and exterior work on existing homes, as well as docks, retaining walls, seawalls, fences, pools, septic tanks, and the like.

0 found in 0 section(s)
  • Septic Inspection Form
  • Business License Application
  • Elevation Certificate
  • Elevator Installation Compliance Letter
  • Weekend Work Permit Application
  • Substantial Improvement Package for Floodplain Construction
  • Site Fill Pre and Post Construction No Adverse Impact Letter
  • Sign Permit
  • Request to Increase Occupancy
  • Permit Application
  • Owner Builder Information
  • Non Licensed Owner Intent to Build to File at ROD
  • Non Conversion Document FEMA
  • Non conversion Agreement Room Restriction
  • Folly Beach V Zone Form
  • Field Treatment Compliance Letter
  • Energy Compliance Form
  • Owner Builder Information
  • Checklist for Close Out of Commercial Construction Projects
  • Checklist for Close Out of Major Renovations
  • Checklist for Close Out of Residential Construction Projects
  • Checklist for New Construction and Additions
  • Checklist for Pool Permits
  • Stormwater MS4 Linear, Manual 2nd edition
  • Site Fill Pre and Post Construction No Adverse Impact Letter
  • Stormwater MS4 Clearing and Grubbing
  • Stormwater MS4 Notice of Intent
  • Stormwater MS4 Single Family Residence and Townhome Application
  • Stormwater MS4 Type I, Manual 2nd edition
  • Type II and II OCRM
  • New Business License Application 257

Department of Building and Planning Mission Statement

To protect the public's safety, general welfare, and property from hazards arising from the construction and use of buildings and structures; protect the environment and preserve the natural beauty of Folly Beach while ensuring fair, impartial, and high-quality inspections, plan reviews, and permitting services for residents, property owners, and visitors alike.

Documents needed to obtain a permit may vary depending on the type of permit.

The following documents will be required for all permit submittals:

Permit submittal packages for new construction or large renovations must be submitted electronically to [email protected].

Trade permits may be submitted electronically to [email protected] or dropped off at City Hall.

Please allow a 4-5 business day processing time for permits that do not require plan review.

(For permits that require plan review, please allow a 4-8 week processing time.)

All requests for inspections must be emailed to [email protected]. Please include the permit number, address, contact information, type of inspection, and any special requirements for the inspector in the request.