You can apply for a permit by contacting the Roseville Electric New Services Division at [email protected].
It's possible for carriers to attach their Small Wireless Facilities to the following infrastructure:
- Roseville traffic signals
- Roseville Electric utility power poles
- Roseville Electric standalone streetlight poles
To reserve a light please send an email to [email protected] with the location of the proposed light. This can be an address, XML File, or Latitude and Longitude of the light.
Once a reservation request has been made and accepted, you will have ninety (90) days to submit your construction documents for a permit or the reservation will be void.
A signed Master License Agreement needs to be obtained prior to installation.
For more information on the required standards click on one of the below documents:
Permit Center
Permit CenterApplications, Forms, & Handouts
Applications, Forms, & HandoutsOnline Permitting Services (OPS) Portal
Online Permitting Services (OPS) Portal