The City of Winder contracts with ESG Operations, Inc. for the operation of the City's wastewater plants and the wastewater collection system.

WATER AND SEWER RATES

For a printable version of the current sewer rates click here.

Key Personnel

  • Regional Manager: Neil Counts, P.E
  • Wastewater Plant Manager: Tyson Page, GA Certified Wastewater Operator Class I
  • Assistant Project Manager: Tyler Black, GA Certified Wastewater Collection Operator

Questions, Comments and Concerns

Any questions, comments or concerns regarding the Wastewater System can be directed to Winder Utilities Department either by email or by phone at (770) 867-7978.

Statistics

Wastewater Treatment Plant Statistics


  Cedar Creek WWTP  
Marburg Creek WWTP

 Permitted Capacity 4.0 MGD   1.5 MGD
Year Monthly Average Flow (MGD) % of Permitted Capacity Annual Rainfall (in)    Monthly Average Flow (MGD) % of Permitted Capacity Annual Rainfall (in)
 2014  1.183  29.6%  40.50    0.482  32.1%  38.80
2015 1.440 36.0% 83.50   0.546 36.4% 85.00
 2016  1.104  27.6%  37.60    0.437 29.1% 36.30
 2017  1.176  29.4%  71.70    0.388  25.9%  60.20
 2018  1.434  35.9%  91.60    0.351  23.4%  82.80
 2019  1.525  38.1%  64.80    0.405  27.0%  61.50
 2020  1.705  30%  97.60    0.584 39.0% 96.50
 2021  1.318  33%  67.20    0.53  35.0%  57.70
 2022  1.211  43%  69.0    0.563  38.0%  68.70